✳
ARES/MISSIONDEEP SPACE OPERATIONS • GAME SIMULATION
01 SPACECRAFT ASSEMBLY/MISSION CLOCK T+0s
MOR–28–01 • 08 NOV 2028
● VISUAL TELEMETRYSPACECRAFT INTEGRATION BAY
MRO / ASSEMBLY MODEL
ENGINEERING / LOADOUT
5 Modular Payloads • Launch Vehicle: ATLAS V-401
MASS2,180 kg
FOLDED WIDTH3.65 m
SOLAR CAPACITY2000 W
BATTERY5600 Wh
TRACKED OBJECT MRO–28TRAJECTORY ASSIST / 2D SIMULATION
MISSION CONTROL

Spacecraft Assembly & Launcher Selection

DESIGN & PREFLIGHT
SLOT 1 — HIRISE / CRISM / CTX / MARCI. Select configuration to balance mass, power, and mission risk.
RISK FACTOR: Micro-vibrations occur when HiRISE and CRISM operate concurrently.
LOADING NASA 3D MESH...
✳ UNITED STATES • SPACE EXPLORATION INITIATIVE / CLASSIFIED BRIEFING
DIRECTIVE 001 / 15.09.2028
THE NEXT FRONTIER

MARS
ORBITAL
MISSION.

Congress has authorized a fictional $100 billion investment for the Mars exploration initiative. You are appointed Flight Director and Lead Systems Engineer: configure the orbiter, select the launch vehicle, pilot the interplanetary trajectory, and insert the spacecraft into Mars science orbit.

DESTINATIONMARS ORBIT
REFERENCE BUSNASA MRO
LAUNCH WINDOW08 NOV 2028
GOVERNMENTAL CAMPAIGN SCENARIO AND LAUNCH DATES ARE FICTIONAL • PHYSICS-INSPIRED EDUCATIONAL GAME (NEXT.JS EDITION)
MOR–28–01
DEEP SPACE SIMULATION
EARTH → MARS